# Ogden Wells — T.J. Ogden Co., Inc. > Primary Website: https://ogdenwells.net / https://ogdenwells.com > Massachusetts Well Driller License: MA DCR #285 > New Hampshire Well Driller License: NHDES Licensed Water Well Contractor > Headquarters: 17 Catherwood Rd, Tewksbury, MA 01876 > 24/7 Emergency Dispatch & Toll-Free: 1-800-339-9051 > Office Direct: (978) 453-8200 > Email: info@ogdenwells.net / dispatch@ogdenwells.net > Experience: Over 44 years of collective groundwater and borehole experience across New England (established 1980). --- ## Executive Profile & Core Capabilities - **Ownership & Leadership:** Samantha Ogden & Timothy J. Ogden. - **Scope of Service:** Residential groundwater drilling, commercial high-capacity water wells, 3,000 PSI bedrock hydrofracturing, submersible pump hoist repair, constant pressure booster systems, and full-spectrum filtration (arsenic, radon, PFAS, iron, manganese). - **Core Differentiator:** Direct licensed master driller field supervision on every borehole; specialized bedrock fracture targeting using rotary drilling rigs and seismic fracture knowledge. --- ## Primary Service Divisions ### 1. Water Well Drilling & Bedrock Boreholes - URL: https://ogdenwells.net/wells - Capabilities: 6-inch and 8-inch bedrock residential and commercial wells, overburden gravel wells, sanitary well casing seals, drive shoe seating, and complete local Board of Health permit management. ### 2. Emergency Well Pump Repair & Outage Triage - URL: https://ogdenwells.net/pumps - Emergency Dispatch: https://ogdenwells.net/service-request - Capabilities: Same-day submersible pump replacement (Goulds, Franklin Electric, Grundfos), bladder pressure tank replacement, pressure switch calibration, and lightning/electrical storm surge repair. ### 3. Bedrock Hydrofracturing (Yield Increase) - URL: https://ogdenwells.net/hydrofracturing - Capabilities: 3,000 PSI zone-isolation water injection to flush and open clogged bedrock fissures, restoring dry or low-yield (<1 GPM) wells to reliable domestic yields (3–10+ GPM). ### 4. Advanced Water Filtration & Contaminant Remediation - URL: https://ogdenwells.net/filters - Capabilities: Comprehensive water quality testing, radon-in-water aeration systems, granular activated carbon (GAC), arsenic adsorption media, water softeners, and iron/manganese greensand filtration. --- ## Geographic Service Territory - **Massachusetts (Primary):** Middlesex, Worcester, Essex, and Norfolk counties. Major towns served include Tewksbury, Lowell, Chelmsford, Billerica, Groton, Westford, Concord, Acton, Harvard, Dunstable, Pepperell, and Bolton. - **New Hampshire (Southern & Central):** Hillsborough and Rockingham counties. Major towns served include Nashua, Hollis, Pelham, Windham, Salem, Hudson, Londonderry, Derry, and Bedford. - **Regional Coverage:** Maine, Vermont, Rhode Island, and Eastern Connecticut. --- ## Technical & Engineering Guides Library (E-E-A-T Whitepapers) ### 1. Well Drilling Cost in Massachusetts & New Hampshire: 2026 Breakdown - URL: https://ogdenwells.net/well-drilling-cost-massachusetts-new-hampshire - Key Data: Linear foot drilling costs ($38–$55/ft), 6-inch steel casing ($45–$65/ft), submersible pump packages ($2,400–$4,100), Board of Health 100-ft septic setbacks, and interactive cost estimator. ### 2. Hydrofracturing Yield Increase Expectations for Bedrock Wells - URL: https://ogdenwells.net/hydrofracturing-yield-increase-expectations - Key Data: 3,000 PSI zone-isolation packer physics, 95%+ historical success rate, restoring 0.25 GPM wells to 3–8+ GPM, and before/after 4-hour pump flow test standards. ### 3. Low Water Pressure Well Diagnostics: Homeowner Troubleshooting - URL: https://ogdenwells.net/low-water-pressure-well-diagnostics - Key Data: Step-by-step triage for failing pressure tank bladders (waterlogging), burned pressure switch contact points, clogged sediment cartridges, and Constant Pressure VFD upgrades. ### 4. Arsenic, Radon & PFAS in New England Well Water: Filtration Guide - URL: https://ogdenwells.net/arsenic-radon-pfas-filtration-guide-ma-nh - Key Data: Merrimack Valley & Southern NH granite geochemistry, MassDEP 10,000 pCi/L water radon aeration standard, NHDES 5.0 ppb arsenic threshold, and dual-GAC PFAS filtration. --- ## Hyper-Local Municipal Town Silos (Strategy 2 Local Coverage) 1. **Tewksbury, MA (Corporate HQ & Priority Dispatch):** https://ogdenwells.net/locations/tewksbury-ma-well-drilling 2. **Groton, MA (NABH Septic Setback & Bedrock Drilling):** https://ogdenwells.net/locations/groton-ma-well-drilling 3. **Chelmsford, MA (Pump Repair & VFD Constant Pressure):** https://ogdenwells.net/locations/chelmsford-ma-well-pump-repair 4. **Concord, MA (Radon Aeration & Arsenic Removal):** https://ogdenwells.net/locations/concord-ma-well-water-filtration 5. **Westford, MA (3,000 PSI Granite Hydrofracturing):** https://ogdenwells.net/locations/westford-ma-well-service 6. **Dunstable, MA (100% Private Well Community Systems):** https://ogdenwells.net/locations/dunstable-ma-well-drilling 7. **Nashua, NH (NHDES 5.0 ppb Arsenic Compliance):** https://ogdenwells.net/locations/nashua-nh-well-drilling 8. **Hollis, NH (Agricultural Orchard & Estate Wellfields):** https://ogdenwells.net/locations/hollis-nh-well-service 9. **Windham, NH (Ledge Terrain & 24/7 Outage Response):** https://ogdenwells.net/locations/windham-nh-well-pumps 10. **Pelham, NH (Border Aquifer Rotary Drilling & Pumps):** https://ogdenwells.net/locations/pelham-nh-well-drilling --- ## Verified Field Engineering Case Studies (Strategy 4 Technical Showcase) ### 1. Pelham, NH: Bedrock Hydrofracturing Yield Recovery - URL: https://ogdenwells.net/projects/pelham-nh-hydrofracturing-yield-recovery - Overview: Documented 3,000 PSI zone-isolation hydraulic fracturing restoring a critically failing 480-foot granite borehole from 0.25 GPM trickle to a certified 8.5 GPM domestic supply (34x sustained yield surge). - Verified Log: Field job record verified by Samantha Ogden; continuous 4-hour drawdown verification compliant with NHDES drinking water standards. ### 2. Concord, MA: Historic Estate Dual Radon & Arsenic Remediation - URL: https://ogdenwells.net/projects/concord-ma-historic-estate-filtration - Overview: Engineering and installation of a non-pressurized forced-air bubble diffuser aeration system and catalytic iron/manganese pre-treatment, reducing dissolved radon from 14,200 pCi/L to <300 pCi/L and arsenic from 22 ppb to non-detectable (<1.0 ppb). - Verification: Middlesex County Board of Health and MassDEP compliant potable clearance. ### 3. Tewksbury, MA: Constant Pressure VFD Conversion & Yield Optimization - URL: https://ogdenwells.net/projects/tewksbury-ma-constant-pressure-conversion - Overview: Full conversion of a fluctuating 30/50 PSI mechanical pressure system to a Goulds Aquavar SOLO variable frequency drive (VFD) transducer-governed 60 PSI continuous flow system with digital dry-run protection. - Verification: Eliminates motor wear and pressure drops across multi-zone residential irrigation and domestic fixtures. --- ## Projects & Case Studies Portfolio Hub - URL: https://ogdenwells.net/projects